BECOSAN® Treatment
Services
Close Services
Open Services
Complete Solutions
Warehouse floor refurbishment
Concrete floor polishing
Concrete floor grinding
Concrete floor repairs
Repairs and floor prep
Expansion joint repair and sealing
Concrete floor cracks repair
Epoxy floor removal
Line marking removal
Concrete patch repair
Screws and anchors removal
Concrete scratch repair
Other services
Turn-Key Warehouse Solutions
Planimetry and levelling service
Line marking
Forklift wheel cleaning system
Industrial air purification
Industrial protection
Industrial racking
Projects
About Us
Contact
Case study: Renovation of a 661,000 sq ft Industrial Floor with BECOSAN®
International project – 3.000 m2 – Kerpen
Hotel parking – 1.000 m2 – Tarifa
Borgui – 500 m2 – Italy
Wrapsign – 1.500 m2 – Germany
International project – 1.000 m2 – Naples
Amazon – 4.500 m2 – Madrid
ETC Connect – 2,000 m2 – Munich
Veith KG – 1.800 m2 – Öhringen
Segro – 16.000 m2 – Belgium
International Project – 5.000 m2 – India
Paragon Semvox – 2.000 m2 – Kirkel
Montosa – 12.000 m2 – Spain
Hordijk – 6,300 m2 – Zaandam
IBS Logistics – 7.000 m2 – Heek
International project – 5.000 m2 – Germany
Middlefart – 500 m2 – Dinamarca
Ezylog – 2.000 m2 – Paris
DHL – 18.000 m2 – Didcot
LeRoy Logistics – 2.000 m2 – Paris
Prologis – 18.000 m2 – United Kingdom
Prologis – 30,000 m2 – Nottingham
Coloplast Distribution – 1.800 m2 – Hamburg
Arax – 8.000 m2 – France
Logistic warehouse – 32.000 m2 – Vianen
REBICE SL – 1.800 m2 – SPAIN
English
Deutsch
(
German
)
Español
(
Spanish
)
Français
(
French
)
Italiano
(
Italian
)
Dansk
(
Danish
)
Nederlands
(
Dutch
)
Türkçe
(
Turkish
)
Svenska
(
Swedish
)
Português
(
Portuguese (Portugal)
)
Indonesia
(
Indonesian
)
English – US
English
Deutsch
(
German
)
Español
(
Spanish
)
Français
(
French
)
Italiano
(
Italian
)
Dansk
(
Danish
)
Nederlands
(
Dutch
)
Türkçe
(
Turkish
)
Svenska
(
Swedish
)
Português
(
Portuguese (Portugal)
)
Indonesia
(
Indonesian
)
English – US